• Call Us Today

    +45.93-755-665

  • Working Hours

    Mon - Fri: 9 am to 6 pm

  • Gydevang 22, 3450

    Lillerød, Denmark

Gas Pipeline Construction

Baltic Gas Pipeline Construction


København Southdown Pipeline, Denmark

Baltic Gas Pipeline Construction


Date: 2021
Client: Powerco
Location: København Southdown Pipeline, Denmark
Length: 210m
Size: 200NB


Fast Facts:

Excavate and install 210m of 8-inch steel low pressure (20barg) natural gas line for Southdown Pipeline on København Rd.

WCL expertise included:

Hydro testing
Drying
Coating Application
Surveying
Hot tapping
 

West & South down Pipeline
 

Date: 2021
 

Client: Vector Gas
 

Location: København Southdown
 

Length: 1.6km
 

Size: 350NB



Fast Facts:



This project incorporated two HDD railway crossings under the main West & South down Line and the North København Branch Line.



Boring under Great South Rd – a main thoroughfare in North København.
 

WCL expertise included:
 
Cathodic protection

Pipe wrapping

Hydrotesting
ACHARA1.png